The short version
- A quotable brief covers the goal, the users, the must-have features, how each will be accepted, integrations, personal data, deadline, budget and handover.
- Write acceptance criteria a stranger could test. They turn arguments about “done” into a checklist.
- Divide your budget by the median day rate to see how many days it buys: £10,000 is 20 days of a full-stack contractor at £500 (our own sum from ITJobsWatch (opens in a new tab)).
- Say what is not in this version. A written “not now” list is the cheapest protection against scope creep.
- Send the same brief to every supplier, so the quotes compare like with like.
Why the brief decides the quote
A developer quoting from a vague brief has two choices: pad the estimate to cover what they cannot see, or quote low and hope. Either way you lose. A clear brief lets each supplier price the same thing, and gives you something to hold them to.
Scope that grows after work starts is common in every kind of project. PMI’s 2018 Pulse of the Profession survey found scope creep in 52% of projects completed in the previous 12 months, across all kinds of project rather than software alone, as reported by ITWeb (opens in a new tab). A brief will not stop every change, but it makes each one visible and priced.
You do not need technical language. Plain English about what users must be able to do is exactly what developers want.
What a quotable brief contains
| Part | What to write | Example |
|---|---|---|
| Goal | The business result, in one sentence | “Let members of our gym book and pay for classes on their phones.” |
| Users | Each kind of user and what they must be able to do | Members book and cancel; instructors see their class lists; staff manage the timetable |
| Must-have features | The smallest set the first version needs, as short user stories | “As a member, I can pay for a class by card.” |
| Acceptance criteria | How you will check that each feature works | See the section below |
| Integrations | Every outside service it must work with | Card payments, email receipts and the calendar the instructors already use |
| Personal data | What data about people it will hold, and who can see it | Names, emails and booking history; card details stay with the payment provider |
| Platforms | Web, iPhone, Android, or a mix | A mobile-friendly web app first; store apps later |
| Deadline | A real date, and why it matters | Live before the January rush |
| Budget | A range you can actually spend | A range lets a supplier propose a smaller version instead of walking away |
| Handover | What you will hold at the end | Repository and accounts in your name, documentation, credentials and a list of third-party services |
A user story is a one-line feature description in the form “as a kind of user, I can do something”. The free Brief Builder walks you through each part and produces a brief ready to send.
Cut it to the first version
The most useful thing a brief can do is say no. Sort features into three groups: must have for launch, should have soon after, and not in this version. Be strict with the first group; in our view most first versions need far fewer features than their founders expect.
Write the “not in this version” list into the brief itself. It stops a supplier assuming you want things you do not, and it gives you a ready-made plan for version two.
Acceptance criteria a stranger could test
Acceptance criteria are the tests a feature must pass before you accept it. Write them so that someone who has never met you could check them. Compare:
- Vague: “Members can cancel bookings.”
- Testable: “A member can cancel up to 12 hours before a class. The place goes to the first person on the waiting list, the member gets a confirmation email, and the card payment is refunded in full.”
The second version tells a developer exactly what to build and price, including the refund and the waiting list they might otherwise have missed. It also settles the argument about whether the work is finished.
Check the budget against the days
Before you send the brief, divide your budget by the advertised median day rate for the skill you need. For a full-stack developer, £10,000 buys 20 days at the £500 median (our own sum from ITJobsWatch (opens in a new tab)). If your must-haves clearly need more than that, cut the list or raise the budget now rather than halfway through.
Allow for costs on top. If you are not VAT-registered and your developer is, part of every invoice is VAT at 20%, so £10,000 including VAT buys about £8,333 of work, nearer 17 days (our own sum from the VAT rate (opens in a new tab)). Marketplace fees reduce it further.
Other skills have other rates: see developer day rates. The Brief Builder runs this check for you and flags a budget that buys fewer days than the scope seems to need.
Adjust the brief for the route
- Marketplace freelancer. Keep it small and specific, split into milestones, each with its own acceptance criteria and payment. See the marketplace route.
- Day-rate contractor. Describe the outcome, the skills needed and roughly how long. Keep the brief and the contract consistent with how the work will really run; the IR35 guide explains why that matters.
- Employee. Turn it into a job specification: the role, the skills, the salary and who they report to. Check the true cost of a salary first.
- Fixed-price team. Send the full brief, and expect a short paid discovery step if the scope is unclear. One UK studio advertises a discovery sprint “from £3,000” over two weeks (a vendor’s own figure, Magora (opens in a new tab)).
- Offshore or nearshore team. Add working hours, language, how you will meet, and whether they will see personal data, which brings in the UK GDPR transfer rules.
Send it, then compare like with like
Send the same brief to two or three suppliers, and ask each to reply with:
- the days or the price for each feature, not just a total;
- the assumptions they made, and what is excluded;
- who will do the work;
- how changes are priced;
- who owns the code and accounts, and from when.
Then check your shortlist with the Vetting Kit. A quote much cheaper than the others usually means the supplier pictured a smaller job, so ask what they left out.